Millfield Farm

Millfield Farm, Raybridge Corporation, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5 MW, grid supply point Sundon.

Customer
Raybridge Corporation
Status
Connected
Capacity
5 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Houghton Regis Grid 33kV
Voltage
33 kV
Date connected
30 Mar 2016
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Dunstable, Sundon
Postcode
LU6 3QP
Export MPAN
1050001060060

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.