March Landfill Site

March Landfill Site, March Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.01 MW, grid supply point Walpole.

Customer
March Energy Limited
Status
Connected
Capacity
1.01 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Walpole
Bulk supply point
March Grid 33kV
Point of connection
March Primary 11kV
Voltage
11 kV
Date connected
9 Feb 2002
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
March
Postcode
PE15 8QN
Export MPAN
1023514116707

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.