Grid GuardianOpen the evidence in the app

Manston Solar Farm

Manston Solar Farm, Beba Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7.6 MW, grid supply point Richborough/Sellindge 132kV.

Customer
Beba Energy
Status
Connected
Capacity
7.6 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Richborough/Sellindge 132kV
Bulk supply point
Richborough Grid 33kV
Point of connection
Manston 11kV
Voltage
11 kV
Date connected
22 Mar 2013
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Manston Court Road, Manston
Postcode
CT9 4LG
Export MPAN
1900090979958

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source