Grid GuardianOpen the evidence in the app

Manor Farm

Manor Farm, Aura Power Solar UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 99.9 MW, grid supply point Richborough/Sellindge 132kV.

Customer
Aura Power Solar UK Limited
Status
Accepted to connect
Capacity
99.9 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Richborough/Sellindge 132kV
Voltage
132 kV
Date accepted
8 Nov 2026
In a connection queue
Yes
Row last updated by the DNO
14 Sept 2026
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Ashford
Postcode
TN26 1NW

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source