Luton Road

Luton Road, ReThink Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.5 MW, grid supply point Sundon.

Customer
ReThink Energy Limited
Status
Connected
Capacity
49.5 MW
Maximum import capacity
49.5 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Sundon 33kV
Voltage
33 kV
Date connected
14 Apr 2023
In a connection queue
No
Row last updated by the DNO
14 Nov 2023
Licence area
EPN
Address
Luton Road, Luton
Postcode
LU4 9UJ
Export MPAN
1050002533705

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.