Lowestoft WWTC

Lowestoft WWTC, Anglian Water Services, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.3 MW, grid supply point Norwich.

Customer
Anglian Water Services
Status
Connected
Capacity
2.3 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Norwich
Bulk supply point
Gorleston Grid 33kV
Point of connection
Bradwell Primary 11kV
Voltage
11 kV
Date connected
28 Feb 2002
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
EPN
Address
Lowestoft
Postcode
NR32 5LB
Export MPAN
1023506027140

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.