Little Flanchford Farm

Little Flanchford Farm, IIOS New Energy, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 11.3 MW, grid supply point Bolney.

Customer
IIOS New Energy
Status
Accepted to connect
Capacity
11.3 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Bolney
Bulk supply point
Leigh Grid
Voltage
33 kV
Date accepted
20 Apr 2022
Target energisation
31 Dec 2030
In a connection queue
Yes
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Flanchford Road, Reigate
Postcode
RH2 8RD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.