Little Flanchford Farm
Little Flanchford Farm, IIOS New Energy, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 11.3 MW, grid supply point Bolney.
- Customer
- IIOS New Energy
- Status
- Accepted to connect
- Capacity
- 11.3 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Bolney
- Bulk supply point
- Leigh Grid
- Voltage
- 33 kV
- Date accepted
- 20 Apr 2022
- Target energisation
- 31 Dec 2030
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Jun 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Flanchford Road, Reigate
- Postcode
- RH2 8RD
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.