Grid GuardianOpen the evidence in the app

Layer De La Haye Wtw

Layer De La Haye Wtw, Essex & Suffolk Water PLC, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Rayleigh.

Customer
Essex & Suffolk Water PLC
Status
Connected
Capacity
2 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Abberton Grid 33kV
Point of connection
Shrub End Primary 11kV
Voltage
11 kV
Date connected
4 Jun 2008
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
EPN
Address
Colchester
Postcode
CO2 0EP
Export MPAN
1030049607787

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source