Grid GuardianOpen the evidence in the app

Langenhoe Hall

Langenhoe Hall, Push Energy (Langenhoe) Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point Rayleigh.

Customer
Push Energy (Langenhoe) Limited
Status
Connected
Capacity
18 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Abberton Grid 33kV
Voltage
33 kV
Date connected
4 Mar 2015
In a connection queue
No
Row last updated by the DNO
14 Dec 2020
Licence area
EPN
Address
Hall Lane, Langenhoe
Postcode
CO5 7NA
Export MPAN
1050000774118

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source