Land West Of Spixworth Road

Land West Of Spixworth Road, Pathfinder Clean Energy (PACE), is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Norwich.

Customer
Pathfinder Clean Energy (PACE)
Status
Connected
Capacity
15 MW
Maximum import capacity
1.12 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Norwich
Bulk supply point
Sall Grid 33kV
Voltage
33 kV
Date connected
26 Sept 2024
In a connection queue
No
Row last updated by the DNO
14 Apr 2025
Licence area
EPN
Address
Norwich
Postcode
NR10 3BX
Export MPAN
1050002552406
Import MPAN
1050002552390

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.