Land East Of Walpole Bank

Land East Of Walpole Bank, Henry Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 99.9 MW, grid supply point Walpole.

Customer
Henry Energy Limited
Status
Accepted to connect
Capacity
99.9 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Walpole
Voltage
132 kV
Date accepted
23 Feb 2022
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
EPN
Address
Walpole St Andrews, Wisbech
Postcode
PE14 7JE

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.