Land At Holly Farm

Land At Holly Farm, BSR Applications, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 13 MW, grid supply point Norwich.

Customer
BSR Applications
Status
Accepted to connect
Capacity
13 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Norwich
Bulk supply point
Trowse Grid 33kV
Voltage
33 kV
Date accepted
26 Mar 2026
In a connection queue
Yes
Row last updated by the DNO
16 Apr 2026
Licence area
EPN
Address
Catfield, Great Yarmouth
Postcode
NR29 5DF

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.