Land Around Chiltern Green And West Hyde Road
Land Around Chiltern Green And West Hyde Road, Boultbee Brooks (Renewables Luton Hoo) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 22.99 MW, grid supply point Sundon.
- Customer
- Boultbee Brooks (Renewables Luton Hoo) Limited
- Status
- Accepted to connect
- Capacity
- 22.99 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Sundon
- Bulk supply point
- Luton South Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 25 Mar 2021
- Target energisation
- 31 Oct 2031
- In a connection queue
- Yes
- Row last updated by the DNO
- 16 Jan 2023
- Licence area
- EPN
- Address
- Hyde
- Postcode
- LU2 9PW
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.