Land Around Chiltern Green And West Hyde Road

Land Around Chiltern Green And West Hyde Road, Boultbee Brooks (Renewables Luton Hoo) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 22.99 MW, grid supply point Sundon.

Customer
Boultbee Brooks (Renewables Luton Hoo) Limited
Status
Accepted to connect
Capacity
22.99 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Luton South Grid 33kV
Voltage
33 kV
Date accepted
25 Mar 2021
Target energisation
31 Oct 2031
In a connection queue
Yes
Row last updated by the DNO
16 Jan 2023
Licence area
EPN
Address
Hyde
Postcode
LU2 9PW

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.