Kings Barn Farm
Kings Barn Farm, Green Hedge Energy Barn Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Bolney.
- Customer
- Green Hedge Energy Barn Limited
- Status
- Connected
- Capacity
- 10 MW
- Technology
- Storage (Storage - Electrochemical (Batteries))
- Flexible connection
- No
- Grid supply point
- Bolney
- Bulk supply point
- Steyning Grid 33kV
- Voltage
- 33 kV
- Date connected
- 7 Dec 2017
- In a connection queue
- No
- Row last updated by the DNO
- 14 Dec 2022
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Steyning
- Postcode
- BN44 3YR
- Export MPAN
- 1900091566820
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.