Grid GuardianOpen the evidence in the app

Hyder International Landfill Site

Hyder International Landfill Site, NFPA Export (CEMG), is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.76 MW, grid supply point Sundon.

Customer
NFPA Export (CEMG)
Status
Connected
Capacity
1.76 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Sundon 33kV
Point of connection
Sundon Primary 11kV T3&T4
Voltage
11 kV
Date connected
24 Sept 1996
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Sundon
Postcode
LU3 3PE
Export MPAN
1023490094814

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source