Hurton Road, Long Meadow
Hurton Road, Long Meadow, Renewable Energy Connections Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3 MW, grid supply point Sundon.
- Customer
- Renewable Energy Connections Limited
- Status
- Connected
- Capacity
- 3 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Sundon
- Bulk supply point
- Houghton Regis Grid 33kV
- Point of connection
- Cheddington Primary 11kV
- Voltage
- 33 kV
- Date connected
- 15 Dec 2015
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- EPN
- Address
- Hurton Road, Ivinghoe
- Postcode
- LU7 9EA
- Export MPAN
- 1050000990984
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.