Grid GuardianOpen the evidence in the app

Hurton Road, Long Meadow

Hurton Road, Long Meadow, Renewable Energy Connections Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3 MW, grid supply point Sundon.

Customer
Renewable Energy Connections Limited
Status
Connected
Capacity
3 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Houghton Regis Grid 33kV
Point of connection
Cheddington Primary 11kV
Voltage
33 kV
Date connected
15 Dec 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Hurton Road, Ivinghoe
Postcode
LU7 9EA
Export MPAN
1050000990984

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source