Huntingdon Wood Recycling Centre 1 - Phs 1

Huntingdon Wood Recycling Centre 1 - Phs 1, Energy 10, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.09 MW, grid supply point Eaton Socon.

Customer
Energy 10
Status
Connected
Capacity
3.09 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Eaton Socon
Point of connection
Huntingdon Grid 11kV
Voltage
11 kV
Date connected
12 Mar 2009
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Huntingdon
Postcode
PE28 0AE
Export MPAN
1030059761820

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.