Horton Quarry Gen1

Horton Quarry Gen1, Viridor Waste Management Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.85 MW, grid supply point Bolney.

Customer
Viridor Waste Management Limited
Status
Connected
Capacity
1.85 MW
Technology
Bioenergy (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Bolney
Bulk supply point
Steyning Grid 33kV
Point of connection
Steyning 11kV
Voltage
11 kV
Date connected
4 Jan 1997
In a connection queue
No
Row last updated by the DNO
12 Aug 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Henfield Road, Henfield
Postcode
BN5 9XH
Export MPAN
1900060442147

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.