Grid GuardianOpen the evidence in the app

Hobland Farm

Hobland Farm, Utility Management Centre, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point Norwich.

Customer
Utility Management Centre
Status
Connected
Capacity
6 MW
Maximum import capacity
0.35 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Norwich
Bulk supply point
Gorleston Grid 33kV
Point of connection
Bradwell Primary 11kV
Voltage
11 kV
Date connected
8 Dec 2021
In a connection queue
No
Row last updated by the DNO
14 Dec 2022
Licence area
EPN
Address
Excalibur Road, Great Yarmouth
Postcode
NR31 7RQ
Export MPAN
1050002251421
Import MPAN
1050002251412

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source