Grid GuardianOpen the evidence in the app

Highfields Farm

Highfields Farm, DNO Consulting Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Rayleigh.

Customer
DNO Consulting Limited
Status
Connected
Capacity
15 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Abberton Grid 33kV
Voltage
33 kV
Date connected
27 Mar 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Kelvedon
Postcode
CO5 9BJ
Export MPAN
1050000563169

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source