Grid GuardianOpen the evidence in the app

Halewick Lane

Halewick Lane, G59 Professional Services Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 36 MW, grid supply point Bolney.

Customer
G59 Professional Services Limited
Status
Accepted to connect
Capacity
36 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Bolney
Bulk supply point
Worthing Grid A 33kV
Voltage
33 kV
Date accepted
6 Aug 2018
Target energisation
31 Dec 2024
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Lancing
Postcode
BN15 0QW

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source