H G Blakes

H G Blakes, Stafford Renewable Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.54 MW, grid supply point Norwich.

Customer
Stafford Renewable Energy Limited
Status
Connected
Capacity
1.54 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Norwich
Bulk supply point
Thorpe Grid 33kV
Point of connection
Horsford Primary 11kV
Voltage
11 kV
Date connected
2 Apr 2012
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Felthorpe, Norwich
Postcode
NR10 4DU
Export MPAN
1030079555856

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.