Greenway Waste Management - Hanson Aveley Landfill Site

Greenway Waste Management - Hanson Aveley Landfill Site, Infinis Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point Warley.

Customer
Infinis Limited
Status
Connected
Capacity
6 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Warley
Bulk supply point
Purfleet Grid 33kV
Point of connection
Rainham Primary 11kV
Voltage
11 kV
Date connected
23 Aug 1999
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
South Ockendon
Postcode
RM15 4HL
Export MPAN
1023490095739

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.