Godmanchester Landfill Site

Godmanchester Landfill Site, Viridis Energy (Norgon) Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3 MW, grid supply point Eaton Socon.

Customer
Viridis Energy (Norgon) Limited
Status
Connected
Capacity
3 MW
Maximum import capacity
0.06 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Eaton Socon
Point of connection
Huntingdon Grid 11kV
Voltage
11 kV
Date connected
31 Mar 2003
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Cow Lane, Godmanchester
Postcode
PE29 2EJ
Export MPAN
1023536852431

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.