Gatwick Airport Electric Forecourt

Gatwick Airport Electric Forecourt, Gridserve EMEA DEPC Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point Bolney.

Customer
Gridserve EMEA DEPC Limited
Status
Connected
Capacity
6 MW
Maximum import capacity
6 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Bolney
Bulk supply point
Smallfield Grid 33kV
Voltage
33 kV
Target energisation
30 Sept 2024
Date connected
8 Dec 2023
In a connection queue
No
Row last updated by the DNO
12 Dec 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Buckingham Gate, Gatwick
Postcode
RH6 0JB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.