Gascoinge Estate Gen

Gascoinge Estate Gen, B&D Energy, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.22 MW, grid supply point Barking West 33kV (LPN).

Customer
B&D Energy
Status
Accepted to connect
Capacity
1.22 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Barking West 33kV (LPN)
Bulk supply point
Axe Street 11kV
Voltage
11 kV
Date accepted
19 Aug 2021
In a connection queue
Yes
Row last updated by the DNO
14 Feb 2025
Licence area
London Power Networks plc
Address
King Edwards Road, Barking
Postcode
IG11 7JL

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.