Gallions Power
Gallions Power, AMP Energy Services Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5 MW, grid supply point Barking West 33kV (LPN).
- Customer
- AMP Energy Services Limited
- Status
- Connected
- Capacity
- 5 MW
- Maximum import capacity
- 0 MW
- Technology
- Gas (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- Barking West 33kV (LPN)
- Point of connection
- Barking West 11kV
- Voltage
- 11 kV
- Date connected
- 17 Jul 2021
- In a connection queue
- No
- Row last updated by the DNO
- 12 Nov 2021
- Licence area
- London Power Networks plc
- Address
- Unit 3 Rima House, Barking
- Postcode
- IG11 0RH
- Export MPAN
- 1200062683243
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.