Grid GuardianOpen the evidence in the app

Fourth Drove Eastern Industrial Estate

Fourth Drove Eastern Industrial Estate, Viridor Waste Management Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 8 MW, grid supply point Walpole.

Customer
Viridor Waste Management Limited
Status
Connected
Capacity
8 MW
Technology
Energy from waste (Steam turbine (thermal power plant))
Flexible connection
No
Grid supply point
Walpole
Bulk supply point
Peterborough Central 33kV
Point of connection
Peterborough Central 11kV
Voltage
11 kV
Date connected
23 Jul 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Peterborough
Postcode
PE1 5UR
Export MPAN
1050000769084

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source