Grid GuardianOpen the evidence in the app

Fountaine

Fountaine, Solarcentury, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 9.52 MW, grid supply point Walpole.

Customer
Solarcentury
Status
Connected
Capacity
9.52 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Walpole
Bulk supply point
Swaffham Grid 33kV
Voltage
33 kV
Date connected
21 May 2013
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Narford, Walpole
Postcode
PE32 1JA
Export MPAN
1030083805795

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source