Forness Point Pumping Station
Forness Point Pumping Station, Southern Water Services Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.8 MW, grid supply point Richborough/Sellindge 132kV.
- Customer
- Southern Water Services Limited
- Status
- Connected
- Capacity
- 1.8 MW
- Technology
- Fossil - Oil (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- Richborough/Sellindge 132kV
- Bulk supply point
- Richborough Grid 33kV
- Point of connection
- St Peters 11kV
- Voltage
- 11 kV
- Date connected
- 11 Jan 2007
- In a connection queue
- No
- Row last updated by the DNO
- 14 Jul 2021
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Pauls Road, Cliftonville
- Postcode
- CT9 3EL
- Export MPAN
- 1900070539547
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.