FDG B-12 Land Near Perch Lake

FDG B-12 Land Near Perch Lake, Solarcentury Holdings Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.85 MW, grid supply point Norwich.

Customer
Solarcentury Holdings Limited
Status
Connected
Capacity
3.85 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Norwich
Bulk supply point
Thorpe Grid 33kV
Voltage
11 kV
Date connected
1 Feb 2016
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Bunns Hill, Norwich
Postcode
NR28 0JA
Export MPAN
1050001021423

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.