FDG B-07 Frogs Loke Solar Farm

FDG B-07 Frogs Loke Solar Farm, Genatec Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4 MW, grid supply point Norwich.

Customer
Genatec Limited
Status
Connected
Capacity
4 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Norwich
Bulk supply point
Thorpe Grid 33kV
Point of connection
North Walsham Primary 11kV
Voltage
11 kV
Date connected
23 Dec 2015
In a connection queue
No
Row last updated by the DNO
14 Feb 2024
Licence area
EPN
Address
Norwich
Postcode
NR28 9LZ
Export MPAN
1050001008672

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.