Grid GuardianOpen the evidence in the app

FDG A-14 Honeysome Road

FDG A-14 Honeysome Road, The Abbey Group, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5 MW, grid supply point Walpole.

Customer
The Abbey Group
Status
Connected
Capacity
5 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Bulk supply point
March Grid 33kV
Voltage
33 kV
Date connected
24 Mar 2016
In a connection queue
No
Row last updated by the DNO
14 Nov 2023
Licence area
EPN
Address
Chatteris
Postcode
PE16 6TG
Export MPAN
1050001036689

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.