Fambridge Farm
Fambridge Farm, South Fambridge Hall Solar Park Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Rayleigh.
- Customer
- South Fambridge Hall Solar Park Limited
- Status
- Accepted to connect
- Capacity
- 50 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Rayleigh
- Voltage
- 132 kV
- Date accepted
- 2 Apr 2019
- Target energisation
- 6 Jan 2025
- In a connection queue
- Yes
- Row last updated by the DNO
- 13 Oct 2023
- Licence area
- EPN
- Address
- Fambridge Road, Rochford
- Postcode
- SS4 3LS
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.