Fambridge Farm

Fambridge Farm, South Fambridge Hall Solar Park Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Rayleigh.

Customer
South Fambridge Hall Solar Park Limited
Status
Accepted to connect
Capacity
50 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Rayleigh
Voltage
132 kV
Date accepted
2 Apr 2019
Target energisation
6 Jan 2025
In a connection queue
Yes
Row last updated by the DNO
13 Oct 2023
Licence area
EPN
Address
Fambridge Road, Rochford
Postcode
SS4 3LS

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.