Grid GuardianOpen the evidence in the app

Estuary Farm

Estuary Farm, Yingli Namene Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Walpole.

Customer
Yingli Namene Solar Limited
Status
Accepted to connect
Capacity
50 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Bulk supply point
Kings Lynn Grid 33kV
Voltage
33 kV
Date accepted
16 Jul 2020
In a connection queue
Yes
Row last updated by the DNO
14 Feb 2023
Licence area
EPN
Address
Kings Lynn
Postcode
PE30 2HY

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source