Elstow Landfill Site

Elstow Landfill Site, Renewable Power Generation Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.76 MW, grid supply point Sundon.

Customer
Renewable Power Generation Limited
Status
Connected
Capacity
1.76 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Austin Canons Grid 33kV
Point of connection
Austin Canons Primary 11kV
Voltage
11 kV
Date connected
21 Jun 1996
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Elstow Landfill Site, Bedford
Postcode
MK42 9YG
Export MPAN
1023478544906

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.