Eastern Way, Arnold White Estates, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.5 MW, grid supply point Sundon.

Customer
Arnold White Estates
Status
Connected
Capacity
1.5 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Sundon 33kV
Point of connection
Leighton Buzzard Primary 11kV
Voltage
33 kV
Date connected
17 Dec 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Leighton Buzzard
Postcode
LU7 9LF
Export MPAN
1050000695947

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.