East Beckham Hall

East Beckham Hall, TGC Renewables, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 9.54 MW, grid supply point Norwich.

Customer
TGC Renewables
Status
Connected
Capacity
9.54 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Norwich
Bulk supply point
Sall Grid 33kV
Voltage
33 kV
Date connected
26 Mar 2014
In a connection queue
No
Row last updated by the DNO
14 Feb 2024
Licence area
EPN
Address
Holt, Norfolk
Postcode
NR25 6NY
Export MPAN
1050000563595

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.