Grid GuardianOpen the evidence in the app

Dunsfold Park Aerodrome 173617

Dunsfold Park Aerodrome 173617, Rutland Group Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point Bolney.

Customer
Rutland Group Limited
Status
Connected
Capacity
1.2 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bolney
Bulk supply point
Leigh Grid 33kV
Point of connection
Cranleigh 11kV
Voltage
11 kV
Date connected
9 Nov 2011
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Stovolds Hill, Cranleigh
Postcode
GU6 8TB
Export MPAN
1900090761363

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source