Duck End Energy Park

Duck End Energy Park, EDP Renewables UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 94.05 MW, grid supply point Eaton Socon.

Customer
EDP Renewables UK Limited
Status
Accepted to connect
Capacity
94.05 MW
Technology
Solar, Wind (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Eaton Socon
Bulk supply point
Little Barford 132kV
Voltage
132 kV
Date accepted
8 Apr 2026
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2026
Licence area
EPN
Address
Silver Street, Huntingdon
Postcode
PE29 2LG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source