Dover Harbour Docks
Dover Harbour Docks, Dover Harbour Board, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 8 MW, grid supply point Richborough/Sellindge 132kV.
- Customer
- Dover Harbour Board
- Status
- Connected
- Capacity
- 8 MW
- Technology
- Fossil - Oil (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- Richborough/Sellindge 132kV
- Bulk supply point
- Folkestone Grid 33kV
- Point of connection
- Dover 11kV
- Voltage
- 11 kV
- Date connected
- 10 Jan 2013
- In a connection queue
- No
- Row last updated by the DNO
- 14 Jun 2021
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Eastern Docks, Dover
- Postcode
- CT17 9BU
- Export MPAN
- 1900060436835
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.