Double Bank Lane

Double Bank Lane, Sun & Alternative Technology Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 9 MW, grid supply point Eaton Socon.

Customer
Sun & Alternative Technology Limited
Status
Connected
Capacity
9 MW
Maximum import capacity
0.05 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Eaton Socon
Bulk supply point
Huntingdon Grid 33kV
Voltage
33 kV
Date connected
17 Mar 2014
In a connection queue
No
Row last updated by the DNO
14 Jun 2021
Licence area
EPN
Address
Huntingdon
Postcode
PE28 5YL
Export MPAN
1050000612950

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.