Danbury Solar Farm

Danbury Solar Farm, Low Carbon Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Rayleigh.

Customer
Low Carbon Limited
Status
Connected
Capacity
15 MW
Maximum import capacity
0.05 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Chelmsford East Grid 33kV
Voltage
33 kV
Date connected
16 Nov 2023
In a connection queue
No
Row last updated by the DNO
14 Oct 2024
Licence area
EPN
Address
North Of Main Road, Chelmsford
Postcode
CM3 4AS
Export MPAN
1050002797117
Import MPAN
1050002797108

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.