Crown Point Estate

Crown Point Estate, Low Carbon Farming 5 Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point Norwich.

Customer
Low Carbon Farming 5 Limited
Status
Connected
Capacity
6 MW
Maximum import capacity
13.36 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
Yes (capacity not firm)
Grid supply point
Norwich
Bulk supply point
Trowse Grid 33kV
Voltage
33 kV
Date connected
6 Oct 2021
In a connection queue
No
Row last updated by the DNO
16 Jun 2022
Licence area
EPN
Address
Kirby Road, Norwich
Postcode
NR14 8RS
Export MPAN
1050002018370
Import MPAN
1050001472920

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.