Crown Point Estate
Crown Point Estate, Low Carbon Farming 5 Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point Norwich.
- Customer
- Low Carbon Farming 5 Limited
- Status
- Connected
- Capacity
- 6 MW
- Maximum import capacity
- 13.36 MW
- Technology
- Gas (Engine (combustion / reciprocating))
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Norwich
- Bulk supply point
- Trowse Grid 33kV
- Voltage
- 33 kV
- Date connected
- 6 Oct 2021
- In a connection queue
- No
- Row last updated by the DNO
- 16 Jun 2022
- Licence area
- EPN
- Address
- Kirby Road, Norwich
- Postcode
- NR14 8RS
- Export MPAN
- 1050002018370
- Import MPAN
- 1050001472920
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.