Crown Point

Crown Point, IGP International Prospecting Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 228 MW, grid supply point Norwich.

Customer
IGP International Prospecting Limited
Status
Accepted to connect
Capacity
228 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Norwich
Voltage
132 kV
Date accepted
19 Mar 2025
In a connection queue
Yes
Row last updated by the DNO
15 May 2025
Licence area
EPN
Address
Norwich
Postcode
NR14 8SL

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.