Crossness Sewage Treatment Works
Crossness Sewage Treatment Works, Crossness Sewage Treatment Works, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 11.06 MW, grid supply point Barking West 33kV (LPN).
- Customer
- Crossness Sewage Treatment Works
- Status
- Connected
- Capacity
- 11.06 MW
- Technology
- Energy from waste, Fossil - Oil (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Barking West 33kV (LPN)
- Voltage
- 33 kV
- Date connected
- 10 Sept 2000, 10 Sept 2000
- In a connection queue
- No
- Row last updated by the DNO
- 16 May 2023
- Licence area
- London Power Networks plc
- Address
- Belvedere Road, Thamesmead
- Postcode
- SE2 9AQ
- Export MPAN
- 1200061171324
Register rows
| Row | Status | MW | Target |
|---|---|---|---|
| 1 | Connected | 5.9 | |
| 2 | Connected | 11.06 |
Rows at one site are not summed.
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.