Coombe Farm

Coombe Farm, Twineham Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 99.9 MW, grid supply point Bolney.

Customer
Twineham Energy Limited
Status
Accepted to connect
Capacity
99.9 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Bolney
Voltage
132 kV
Date accepted
16 Mar 2021
Target energisation
31 Jan 2029
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Bob Lane, Haywards Heath
Postcode
RH17 5NH

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.