Coniston House {Boiler Room)

Coniston House {Boiler Room), London Borough of Southwark, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1 MW, grid supply point New Cross 66kV.

Customer
London Borough of Southwark
Status
Connected
Capacity
1 MW
Technology
Gas (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
New Cross 66kV
Bulk supply point
Chadwick Road 33kV
Point of connection
Bengeworth Rd 11kV
Voltage
0.4 kV
Date connected
1 Jan 2005
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
London Power Networks plc
Address
Wyndham Housing Estate, Camberwell
Postcode
SE5 0UF
Export MPAN
1200010260136

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.