New Cross 66kV grid supply point

3 connections of 1 MW and over at New Cross 66kV in UK Power Networks's register of 14 Oct 2026: 0 MW accepted to connect and 6.2 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.

SiteCustomerTechnologyMWStatusTarget energisation
Kings College HospitalKings College HospitalGas4.2Connected
301 Camberwell New RoadWalworth GarageStorage1Connected
Coniston House {Boiler Room)London Borough of SouthwarkGas1Connected