Common Barn Wind Farm Phase 2
Common Barn Wind Farm Phase 2, Tci Renewables Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6.15 MW, grid supply point Eaton Socon.
- Customer
- Tci Renewables Limited
- Status
- Accepted to connect
- Capacity
- 6.15 MW
- Technology
- Onshore wind (Onshore wind turbines)
- Flexible connection
- No
- Grid supply point
- Eaton Socon
- Bulk supply point
- Little Barford 33kV
- Voltage
- 33 kV
- Date accepted
- 5 Feb 2018
- Target energisation
- 31 Oct 2028
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Feb 2023
- Licence area
- EPN
- Address
- The Street, St Neots
- Postcode
- PE19 5XU
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.